High Frequency Online 10kVA 220V Sine Uninterruptible Power Supply 20kVA Pure Sine Wave UPS Power
|
Still deciding? Get samples of $ !
Request Sample
|
Product Details
| Customization: | Available |
|---|---|
| Phase: | Single Phase |
| Type: | On-line |
Diamond Member Since 2014
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Address
1409-1410, Tongfang Center, The Intersection of Zhongxin Rd. and Haoxiang Rd., Xinqiao ...
International Commercial Terms(Incoterms)
CFR, CIF, CIP, EXW
Terms of Payment
LC, T/T, PayPal, Western Union, Money Gram
Find Similar Products
Basic Info.
- Model NO.
- Queen Star Series 6K-20Kva
- Protection
- Overvoltage
- Application
- Communication
- Standby Time
- Standard Machine
- Standby UPS
- Sine Wave Output UPS
- Output Capacity
- Medium Type
- Equipment Mode
- Centralized Model
- Transport Package
- Carton Box or Wooden Pallet
- Specification
- 260*510*717
- Trademark
- UPSEN OR OEM
- Origin
- China
- Production Capacity
- 50000PCS/1year
Product Description









FAQ
Q1. What is packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7-20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you OEM and ODM Service?
A: Yes, we can provide free OEM Service, and ODM Service is available for volume order too.
Q6. What is your sample policy?
A: We can supply samples for test for first time, but the customers have to pay the sample cost and
the courier cost. And if clients can confirm a volume order after sample test, we can reduce sample cost from next order.
Q7. Do you test all your goods before delivery?
A: Yes, all our products have more than 6~8 hours for aging, and strict test before dispatch
Q8: What's UPSEN Factory advantage?
A: 1: High working efficiency and production, to be sure compeitive price
2: Strict material quality control, to be sure all materials meet CE standards
3: Independent test equipment suitable for most international standard tests
4: Each process been tested before assembling which can assure low fault rate, and improve shortages
5: Professional R&D Engineers with average bachelor degree
6: Products average upgrading every 1.5~2 years
7: 1% free unit or 2% free parts for timely warranty service
8: Free technical support before and after sales
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7-20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you OEM and ODM Service?
A: Yes, we can provide free OEM Service, and ODM Service is available for volume order too.
Q6. What is your sample policy?
A: We can supply samples for test for first time, but the customers have to pay the sample cost and
the courier cost. And if clients can confirm a volume order after sample test, we can reduce sample cost from next order.
Q7. Do you test all your goods before delivery?
A: Yes, all our products have more than 6~8 hours for aging, and strict test before dispatch
Q8: What's UPSEN Factory advantage?
A: 1: High working efficiency and production, to be sure compeitive price
2: Strict material quality control, to be sure all materials meet CE standards
3: Independent test equipment suitable for most international standard tests
4: Each process been tested before assembling which can assure low fault rate, and improve shortages
5: Professional R&D Engineers with average bachelor degree
6: Products average upgrading every 1.5~2 years
7: 1% free unit or 2% free parts for timely warranty service
8: Free technical support before and after sales
Send your message to this supplier
People who viewed this also viewed
Product Groups
More
Find Similar Products By Category
- Supplier Homepage
- Products
- High Frequency Online UPS
- Tower Online UPS
- High Frequency Online 10kVA 220V Sine Uninterruptible Power Supply 20kVA Pure Sine Wave UPS Power
Related Categories
Hot Searches
More